1 00:00:04,782 --> 00:00:07,480 We will need: two twine nails 2 00:00:07,480 --> 00:00:09,960 1 x patch cord 3 00:00:09,960 --> 00:00:12,240 1 x Bubble Level 4 00:00:12,240 --> 00:00:14,400 1 x Folding Ruler 5 00:00:14,400 --> 00:00:17,000 1 x pouf 6 00:00:17,000 --> 00:00:19,600 1 x curb tongs and 1 x shovel 7 00:00:19,600 --> 00:00:22,320 curbs 8 00:00:22,625 --> 00:00:49,265 Excavation of the shelf (rough) 9 00:00:50,183 --> 00:00:55,903 Insert twine nails accordingly 10 00:00:56,423 --> 00:01:13,903 Tension the cord parallel to the board (note slope) 11 00:01:16,117 --> 00:01:22,757 and fix 12 00:01:24,766 --> 00:01:38,046 excavate according to the depth of the curb 13 00:02:40,915 --> 00:02:51,275 Plan substructure 14 00:02:55,459 --> 00:03:04,105 Check excavation depth 15 00:03:04,166 --> 00:03:12,186 Insert the shelf vertically and horizontally with curb pliers 16 00:03:12,676 --> 00:03:17,516 horizontal control 17 00:03:17,907 --> 00:03:21,049 plumb control 18 00:03:21,109 --> 00:03:26,149 Fasten the curb with dry mortar or sand 19 00:03:26,707 --> 00:03:31,169 fill up 20 00:03:57,706 --> 00:04:06,986 and solidify 21 00:04:13,040 --> 00:04:17,200 Finished!